K24 e30
Collapse
X
-
Updates : I've been drinking a lot of beer and working 60-65 hours a week. I've just been collecting parts waiting in work to slow down a little so I have time/energy to work on it. The standalone should be here at the end of the month, injectors are here, fuel pumps are here. Parts wise I just need to measure and order a driveshaft. I'm down to one page on the to be completed list.Leave a comment:
-


Front brake and spindle parts are here. 280mm rotors and wilwood radial mount calipers. Trying to get all the parts sent off to get machined for the front spindles next week. I decided to build new spindles to take nissan s13 coilovers and unit type wheel bearings. Mini Cooper rear hubs in the front and possibly e90 hubs as a 5 lug option.Leave a comment:
-
Updates: not much actual work has been done on the car. I measured for wheel spacers and got those ordered. Half of my wheel studs arrived, waiting for the other set. New front and rear wheel bearings and e brake shoes are in. Not much to report otherwise.Leave a comment:
-
-
[IMG]http://[URL=http://s1251.photobucket.com/user/slowgti18t/media/B443C999-4EC9-4290-AEED-1B083396546D.jpg.html]Leave a comment:
-
Street wheels and tires are mounted and balanced. I'll get some pics this afternoon, 15x9 esm 007 with falken 225/50-15's. I pulled all of the wiring out if the car and started trimming the body harness down, I've pulled about 5 lbs of excess wire so far. All of the factory obc, power mirror wiring, etc. The bov and flange showed up last week also. Not much time to work on it lately, 60+ hour work weeks.Leave a comment:




Leave a comment: