Hairy...im droppin the hammer......
big update.brought the car home from my buddy/fabricators house. he needed his shop back and i was tired of having it at his house. intercooler piping is done now. just need to make intake pipe and run coolant hoses,fuel line, and clutch line. little stuff and then off to wiring.
as far as today i mounted up my new wing and rear valance and finally took some good pics since the rebuild. super stoked for this to be done. gettin close. going to have piping and valve covers powder coated in the same color as the wheels. might do valve covers kawasaki green. anyways on to the important part.






The wheels are rota p45-r 17x9.5 all around. after adapters over all et of +5 front and +0 rear. CA swap is almost done. wiring and plumbing then its done. ill take a pic of that when its all done. for now this is what you get.

big update.brought the car home from my buddy/fabricators house. he needed his shop back and i was tired of having it at his house. intercooler piping is done now. just need to make intake pipe and run coolant hoses,fuel line, and clutch line. little stuff and then off to wiring.
as far as today i mounted up my new wing and rear valance and finally took some good pics since the rebuild. super stoked for this to be done. gettin close. going to have piping and valve covers powder coated in the same color as the wheels. might do valve covers kawasaki green. anyways on to the important part.






The wheels are rota p45-r 17x9.5 all around. after adapters over all et of +5 front and +0 rear. CA swap is almost done. wiring and plumbing then its done. ill take a pic of that when its all done. for now this is what you get.


Comment