Sadly, staring at the: powder coated rear sub frame, poly bushings i made to raise it 12mm along with the spacers for the diff, extra diff cover with aluminum bushing, ss brake lines, RX-7 brakes, Stahl long tubes, coilover kits, oil filter relocation kit, semi finished euro elips with real bi xenon, urathane steering puck, maybe my roll cage and what ever else i was going to do.
Found out yesterday i have the first surgery for my last proceedure on my wrist on the 29th of December. That means 4 months of one hand in a bandage and 2 surgeries in that time and everything getting put off until after the stitches and staples come out.
Found out yesterday i have the first surgery for my last proceedure on my wrist on the 29th of December. That means 4 months of one hand in a bandage and 2 surgeries in that time and everything getting put off until after the stitches and staples come out.
Comment