Went fairly smoothly. Took me 3 hours to install the pilot bearing, flywheel, clutch and pressure plate, bolt the tranny to it, install the starter, and lower it into the car.


Motor and Transmission installed.
Collapse
X
-
Motor and Transmission installed.
Tenured Automotive Service Professional - Avid BMW Enthusiast
Vapor Honing & E30 ABS Pump Refurbishment Service
https://mtechniqueabs.com/Tags: None -
word, looks like u need some belts, a distribtor, radiator and you will be ready to go!98 M3/4/5

Comment
-
mmmmmmmmmm tastey :twisted:-Pete
LRRS/CCS#187 ECK-Racing, Ironstone Ventures, Tony's Track Days
Pine Motorparts/PBE Specialists | Phoenix Graphics | Woodcraft | Moon Performance | RJ's Motorsport | Motorcycles of Manchester

The Garage: '03 Tuono (Hooligan bike :naughty) | '06 SV650 (race)Comment
-
Man, that looks awesome. The crinkle paint looks awesome in that engine bay.
Perhaps I will be taking up a project similar to this soon...Comment
-
I will do it later, after the paint is fully cured.Originally posted by Eurospeed88Jordan, did you decide not to polish the raised parts of the valve cover and manifold?
Looks great, can't wait to see it on the road.Tenured Automotive Service Professional - Avid BMW Enthusiast
Vapor Honing & E30 ABS Pump Refurbishment Service
https://mtechniqueabs.com/Comment
-
OMFG that is freakin clean! When i get to see it in person can i give it a hump or two? :oops:
Brian
Comment
-
I think you should know that no project is ever complete :)Originally posted by TIATOLooks real good Jordan. Very impressive. Amazingly clean motor. How much more time until your ground up rebuilt is complete?Comment



Comment