If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Disassembled my pedal cluster, welded an adjustable stop on my on my clutch pedal and took all the parts over to get powder coated. There will be water on the floor at some point so the powder is mainly for protection.
EDIT: Powder coater just called 3 hours after i dropped the parts off, powder coating is ready to pick up !
My only question is where does the thermostat install at?
There are 2. The main thermostat is in the engine cases, you can see the top of it in front of the oil pressure switch in this picture. It's the football shaped piece of aluminum with two nuts holding it down (you can only see one nut in the pic).
The second thermostat controls oil flow to the front oil cooler. It's in front of the rear wheel with the 2 shiny oil lines going into it.
Cleaned, regreased and rebooted my late model axles. This shot shows one how i got it and one finished. The inner CVs are worn but they will do for a while.
I was missing the load spreading washer plates and even german aftermarket are over 10 dollars each ($65 for both axles) so i had to do something else. The CVs looked about E28 (bmw) sized so i called up a buddy who has E28s and he gave me 6. Perfect fit!
I rebuilt the entire emergency brake system as it was rusted solid. Had to cut the cables off the handle. Where the new german cable housings meet the body they were about .2mm smaller than the originals so they wouldn't slip over the protruding tubes. Very annoying. Ended up wrapping thin strips of emory cloth around them and sanded the tubes down til they fit.
New cables on, drums cleaned and lubed and adjusted. Longer wheel studs too.
The emergency brake cable tubes in the chassis were filled with solidified grease that was so thick i could barely pull the cables through it. I had to get rid of it before the new cables went in so i came up with this. It is a piece of one of the old cables that i hammered the end into a y shape a little smaller than the tube. i chucked it up in my cordless drill and used it like a plumbing snake. It worked great.
Pedal cluster removed for new bushings. A couple pieces are pretty worn so i ordered some more parts tonight. I'm going to check my powder coaters schedule and see if he can slip the pedals into a batch in the next day or two. We will see.
Leave a comment: