Well, lets call it about 3 hours of work to go from here:
Headed in the right direction by 2mAn
to this:
Headed in the right direction by 2mAn
and this garbage is out... the header itself didnt look too bad once you got the all of the tin can crap, wires and hose clamps off
Headed in the right direction by 2mAn
part of that time was spent trying to modify a 10mm wrench to remove the stacks. I should probably buy my own and get these back to Will :oops:
Headed in the right direction by 2mAn
the studs dont look too bad, so I might just clean them up, but I wont have time to do anything until Friday.
Thoughts?
Headed in the right direction by 2mAn
to this:
Headed in the right direction by 2mAn
and this garbage is out... the header itself didnt look too bad once you got the all of the tin can crap, wires and hose clamps off
Headed in the right direction by 2mAn
part of that time was spent trying to modify a 10mm wrench to remove the stacks. I should probably buy my own and get these back to Will :oops:
Headed in the right direction by 2mAn
the studs dont look too bad, so I might just clean them up, but I wont have time to do anything until Friday.
Thoughts?
Comment