Well Its been almost a year since I took delivery on my e30. Since then I have worked almost every weekend on it. The heat slowed me down for the summer.
To date here are the big projects I have done so far:
Replace entire interior
Motor swap from M10 to M20
Installed bav auto chip
Installed Stahl Long Tube headers
Face lift from big surf board bumpers to plastic bumpers
Converted to new bmw shift carrier and installed a B&M Short shifter
Installed carbon fiber hood
Electric fan conversion
H&R Sport springs (to be installed)
4.10 LSD
Depo Smiley projectors
Paint job coming soon
Also obtained euro black trim... to be installed after paint
Here are pictures of my progress
Before I picked it up
Second week
To date here are the big projects I have done so far:
Replace entire interior
Motor swap from M10 to M20
Installed bav auto chip
Installed Stahl Long Tube headers
Face lift from big surf board bumpers to plastic bumpers
Converted to new bmw shift carrier and installed a B&M Short shifter
Installed carbon fiber hood
Electric fan conversion
H&R Sport springs (to be installed)
4.10 LSD
Depo Smiley projectors
Paint job coming soon
Also obtained euro black trim... to be installed after paint
Here are pictures of my progress
Before I picked it up
Second week
Comment