If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Valve cover is back from powder coating...also rear end is just about done made brackets to mount sway bar. I laid the floor out just have to measure out spots for the rivets.
outstanding job on that catch can.....I will be building my own as well. What thickness of aluminum did you use? I have some 18ga laying around I was going to throw together. Also, what tig-rig do you have? I don't think I saw it in any pictures.
Freebie...1 3/4-1/8th thick mild steel roll cage tubing for rear shock tower brace I'm building. 24' total of tubing need to clean the surface rust off. After everything is all done I'm painting the entire trunk black.
I plan on increasing my traction so don't want to deal with having the stock mounting point to rip out. I'm also hoping it reduces diff movement to help with wheel hope.
Leave a comment: