Supposed to start work on february but till now i had the spare time.
Yesterday, after 4 hours if work me and a friend dropped the subframe in order to do some surgery.

Going in:
Repaired axles with new boots.
Marshalls adjustable toe/ camber subframe
Thanks to blunt for these parts.
New ebrake cables
New cabs
New subframe bushings
All new hardware/ bolts, washers, nuts, etc...
Brembo rotors square
Pagid frot pads
Ate rear pads
SS brake lines (blunttech)
rebuilt girling calipers (thanks levent)
Clean and paint diff and control arms
Maybe i missed something...
Yesterday, after 4 hours if work me and a friend dropped the subframe in order to do some surgery.

Going in:
Repaired axles with new boots.
Marshalls adjustable toe/ camber subframe
Thanks to blunt for these parts.
New ebrake cables
New cabs
New subframe bushings
All new hardware/ bolts, washers, nuts, etc...
Brembo rotors square
Pagid frot pads
Ate rear pads
SS brake lines (blunttech)
rebuilt girling calipers (thanks levent)
Clean and paint diff and control arms
Maybe i missed something...
Comment