If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Setup for going to the track. The other 235/40/17 is in the spare tire well.
Going to paint the metal parts that hold the load bars red to match. The other 2 load bar that ties the 2 main bars together is 1/2" steel square tubing that holds the tires together as well as does not let the load bars separate and stress the roof due to how low I mounted the tires.
Comment