Getting the intercooler fitted up.
things that need to be finished over the next week -
IC mounted
Gear shift install
Steering joint and rack out back in
Car sat down and torque of the front suspension
gas lines hooked up
starter wired up
turbo oil feed and return line finished up
final tightening of clocked turbo
final tightening of Wastegate and downpipe
fitting and install of IC piping
things that need to be finished over the next week -
IC mounted
Gear shift install
Steering joint and rack out back in
Car sat down and torque of the front suspension
gas lines hooked up
starter wired up
turbo oil feed and return line finished up
final tightening of clocked turbo
final tightening of Wastegate and downpipe
fitting and install of IC piping
Comment