The elevator is very good. Too bad I have a garage in the basement so the ceiling is low enough for that.
You were rightly told about 28 days, it is during this period that concrete reaches its calculated strength. But I didn't understand why you didn't immediately make out of concrete the studs for mounting the lift? It would be easier and stronger than drilling concrete and setting anchors now.
You were rightly told about 28 days, it is during this period that concrete reaches its calculated strength. But I didn't understand why you didn't immediately make out of concrete the studs for mounting the lift? It would be easier and stronger than drilling concrete and setting anchors now.





Comment